Construction of a new landfill for municipal waste - Enna

Intervention area: 10,000.00 square meters

Work Timeline: 10 months

DETAILS
- Realization of the bank dividing the two basins (A and B) 
- Laying of impermeable covers, the drainage layers, the percolate lines and relative containment basins in reinforced concrete and the percolate recovery pumps
- Realization of defence banks with gigantic boulders and two ducts to channel away the rainwater

Best project

Realisation and implementation of safety enforcement plans at landfills
Reclamation of contaminated sites
Reclamation of products containing asbestos