Intervention area: 10,000.00 square meters
Work Timeline: 10 months
DETAILS
- Realization of the bank dividing the two basins (A and B)
- Laying of impermeable covers, the drainage layers, the percolate lines and relative containment basins in reinforced concrete and the percolate recovery pumps
- Realization of defence banks with gigantic boulders and two ducts to channel away the rainwater