Realisation and implementation of safety enforcement plans at landfills

Construction of a new landfill for municipal waste - Enna

Intervention area: 10,000.00 square meters

Work Timeline: 10 months

DETAILS
- Realization of the bank dividing the two basins (A and B) 
- Laying of impermeable covers, the drainage layers, the percolate lines and relative containment basins in reinforced concrete and the percolate recovery pumps
- Realization of defence banks with gigantic boulders and two ducts to channel away the rainwater

Closure and environmental reclamation c/o controlled underground system at Basse di Stura - Torino

Intervention area: 40.000,00 square meters

Work Timeline:
14 months

DETAILS
- Construction of waterproofed perimeter embankments
- Construction of the drainage network for biogas from embankments
- Construction of roads on the perimeter embankments
- Regularisation of the area and formation of gradients
- Installation of the biogas drainage network
- Implementation of environmental restoration stratigraphy (capping)

Best project

Realisation and implementation of safety enforcement plans at landfills
Reclamation of contaminated sites
Reclamation of products containing asbestos

Realisation and implementation of landfills