Intervention area: 40.000,00 square meters
Work Timeline: 14 months
DETAILS
- Construction of waterproofed perimeter embankments
- Construction of the drainage network for biogas from embankments
- Construction of roads on the perimeter embankments
- Regularisation of the area and formation of gradients
- Installation of the biogas drainage network
- Implementation of environmental restoration stratigraphy (capping)
- Superficial storm water process system works
- Turf laying on the area